INSTALLATION AND REMOVAL
HIGH REACH DEMOLITION MANUAL
7-34
CAUTION
Do not slew the upper structure of the high reach demolition
machine with the additional counterweight installed, with
only demolition boom 1 installed
18. Using suitable lifting and support equipment, remove the
additional demolition counterweight from the main demolition
counterweight. Eyebolts are provided with the machine for
this purpose.
Refitting the High reach Demolition Equipment is achieved by fol-
lowing steps above in the reverse order (start with step 17 and fin-
ish with step 1.
CAUTION
Whenever installing work equipment, always complete the installation by purging the hydraulic circuits of
air. Follow the steps in PURGING AIR PROCEDURES (7-42).
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...