HIGH REACH DEMOLITION MANUAL
TRANSPORTATION
7-49
TRANSPORTATION (high reach demolition equipment alone)
7
PROCEDURE FOR LOADING ON TO TRAILER
CAUTION
It is the responsibility of the transporting company to ensure
that the load is secure and safe.
This procedure includes the following basic steps:
1.
Prepare the work equipment.
2.
Approach the trailer.
3.
Install the equipment onto the trailer.
4.
Detach the work equipment and move machine away.
PREPARING HIGH REACH WORK EQUIPMENT FOR TRANSPORT
1.
There must be plenty of room available to manoeuvre the
machine for removal of work equipment. Make sure the oper-
ations are carried out in a flat, level, spacious area.
2.
Fit the transport pin, holding the demolition equipment arm to
the demolition boom.
CAUTION
With the transport pin in position, do not operate the arm or
mid link. Significant damage to the machine will result.
3.
With the high reach work equipment in the normal travel posi-
tion (see diagram), move the machine into a position where
there is plenty of room to access the work equipment, even in
the lowered position.
4.
Carefully lower the demolition work equipment.
transport pin
Travel Posture
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...