MACHINE OPERATIONS AND CONTROLS
OPERATION
3-178
REMARK
When installing the bucket, for arm pin portion (A), fit O-ring (3)
to bucket (4) in the position shown in the diagram on the right.
After inserting the pin, fit it in the standard groove.
For link pin portion (B), install the bucket with O-ring (3) fitted in
the standard groove.
4.
Install the stopper bolts and nuts for each pin, then grease
the pin.
REMARK
Lubricate with grease thoroughly until the grease comes out
from the end face.
When replacing the bucket, replace the dust seal if it has been
damaged. If a damaged seal is used without being replaced,
sand and dirt may enter the pin portion and cause abnormal
wear of the pin.
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...