OPERATION
DETAILED CONTROLS AND GAUGES
3-107
4.
Press temperature setting switch (3) and set temperature
on the display (7) monitor to maximum heating.
5.
Adjust vents (A), (B1), and (B2) so that the air blows onto
the window glass.
(Vents (C) and (D) are fixed and cannot be adjusted.)
When operating in the rainy season or when it is desired to
remove the mist from the window glass or to dehumidify the air,
turn air conditioner switch (8) ON.
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...