MAINTENANCE
SAFETY CRITICAL PARTS
4-17
SAFETY CRITICAL PARTS LIST
4
No.
Safety critical parts for periodic replacement
Q'ty
Replacement interval
1
Fuel return hose (engine - fuel tank)
1
Every 2 years or 4000 hours,
whichever comes sooner
2
Fuel hose (fuel tank - engine)
1
3
Fuel hose (fuel filter - injection pump)
1
4
Fuel hose (water separator - engine)
1
5
Pump outlet hose (pump - control valve)
2
6
Front/rear pump branch hose
2
7
Work equipment hose (boom cylinder inlet port)
4
8
Work equipment hose (bucket cylinder line, boom foot)
2
9
Work equipment hose (bucket cylinder inlet port)
2
10
Work equipment hose (bucket cylinder inlet port, 4.0 m arm)
2
11
Work equipment hose (arm cylinder line, boom foot)Åj
2
12
Work equipment hose (arm cylinder inlet port)
2
13
Attachment additional line hose (boom foot)
2
14
Attachment additional line hose (boom intermediate)
2
15
Attachment additional line hose (boom top)
2
16
Swing line hose (swing motor inlet port)
2
17
Main suction hose
1
18
Gear pump suction hose
1
19
Heater hose
2
20
Travel line hose (control valve - swivel joint)
4
21
Travel line hose (swivel joint - travel motor)
4
22
Accumulator (for control circuit)
1
23
High-pressure piping clamp
1
Every 8000 hours
24
Missing fuel spray prevention cap
14
25
Seat belt
1
Every 3 years
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...