HIGH REACH DEMOLITION MANUAL
TRANSPORTATION
7-53
23. Ensure that all exposed bores, pins, hoses and tubes are
thoroughly protected from corrosion and foreign matter.
WARNING
When reversing the machine from the demolition work equipment, make sure that all operators are stand-
ing well clear of the machine and equipment.
Removing the High Reach Demolition Equipment from the trailer is achieved by following steps above in the
reverse order (start with step 23 and finish with step 1.
CAUTION
Whenever installing work equipment, always complete the installation by purging the hydraulic circuits of
air. Follow the steps in “PURGING AIR PROCEDURES”.
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...