8-47
1. REMOVAL AND INSTALL OF MOTOR
REMOVAL
Lower the work equipment to the ground
and stop the engine.
Loosen the breather slowly to release the
pressure inside the hydraulic tank.
Escaping fluid under pressure can
penetrate the skin causing serious in
injury.
When pipes and hoses are disconnected,
the oil inside the piping will flow out, so
catch it in oil pan.
Disconnect pipe assy(2, 3)
Disconnect pilot line hoses(4, 5, 6, 7, 8)
Sling the swing motor assembly(1)and
remove the swing motor mounting bolts(9)
ş
Motor device weight : 218kg(481lb)
ş
Tightening torque : 57.9kgf
ş
m
(418.8lbf
ş
ft)
Remove the swing motor assembly.
When removing the swing motor
assembly, check that all the piping have
been disconnected.
INSTALL
Carry out installation in the reverse order
to removal
Bleed the air from the swing motor.
Remove the air vent plug.
Pour in hydraulic oil until it over flows from
the port.
Tighten plug lightly.
Start the engine, run at low idling, and
check oil come out from plug.
Tighten plug fully.
Confirmed the hydraulic oil level and
check the hydraulic oil leak or not.
GROUP 5 SWING DEVICE
4
3
2
1
5
6
7
8
9
1)
2)
(1)
(2)
Ɠ
(3)
(4)
(5)
(6)
Ɠ
(1)
(2)
ڸ
ڹ
ں
ڻ
ڼ
(3)
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...