3. COMPLETING WORK
If the coolant has been drained, tighten the drain valve, and add water to the specified level. Run
the engine to circulate the water through the system. Then check the water level again.
If the hydraulic equipment has been removed and installed again, add engine oil to the specified
level. Run the engine to circulate the oil through the system. Then check the oil level again.
If the piping or hydraulic equipment, such as hydraulic cylinders, pumps, or motors, have been
removed for repair, always bleed the air from the system after reassembling the parts.
Add the specified amount of grease(Molybdenum disulphied grease) to the work equipment related
parts.
1)
2)
3)
4)
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...