8 - 146
BOOM ASSEMBLY
Removal
Remove arm and bucket assembly.
For details, see removal of arm and
bucket assembly.
Remove boom cylinder assembly from
boom.
For details, see removal of boom
cylinder assembly.
Disconnect head work wiring.
Disconnect bucket cylinder hose(2) and
arm cylinder hose(1).
When the hoses are disconnected, oil
may spurt out.
Sling boom assembly(3).
Remove bolt(4), nut(5) and pull out the
pin(6) then remove boom assembly.
ş
Weight :1230kg(2710lb)
When lifting the boom assembly always
lift the center of gravity.
Install
Carry out installation in the reverse order
to removal.
When lifting the boom assembly, always
lift the center of gravity.
Bleed the air from the cylinder.
(1)
(2)
ڸ
ڹ
ں
ڻ
Ɠ
ڼ
ڽ
Ɠ
ڸ
Ɠ
3)
2
1
4, 5, 6
3
Crane
6
4
5
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...