6 - 48
TEST PROCEDURE
Test 9 : Check electric current at EPPR
valve at F-mode
Install multimeter as figure.
Start engine.
Set F-mode with 1750
Ź
50rpm.
Check electric current.
CN-75
Multimeter
EPPR VALVE
CN-75
Supply line, pilot press
Pressure adjusting
screw locknut
(1)
ڸ
ڹ
ں
ڻ
2)
Test 10 : Check pressure at EPPR valve
at F-mode
Connect pressure gauge at EPPR valve.
Start engine.
Set F-mode with 1750
Ź
50rpm.
Operate bucket lever completely push or
pull.
Hold arm lever at the end of stroke.
Check pressure at relief position.
(2)
ڸ
ڹ
ں
ڻ
ڼ
ڽ
SPEC : 400~500mA
SPEC : 15~25kgf/cm
2
(218~363psi)
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...