6 - 57
TEST PROCEDURE
Test 14 : Check voltage between connector
CN-88 - GND.
Start key ON.
Disconnect connector CN-88 from power
max solenoid valve.
Check voltage as figure.
(1)
ڸ
ڹ
ں
2)
Test 15 : Check resistance between
connector CN-50(21)-GND.
Starting key OFF.
Remove CPU controller and disconnect
connector CN-50 from CPU controller.
Check resistance as figure.
(2)
ڸ
ڹ
ں
Power max.
solenoid valve
CN-88
Multimeter
CN-88
LH lever
Power max. switch
CN-50
CPU
CONTROLLER
CN-51
CN-52
CN-53
Ground
15
12
11
10
9
1
2
3
17 18 19
Multimeter
CN-50
20 21 22
4
5
6
13 14
7
8
16
23 24
SPEC : Key ON : 24
Ź
1V
Key OFF : 0V
Resistance : 15~30
װ
SPEC : Power max button pressed ON : 0
װ
Power max button released OFF :
ſװ
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...