3 - 29
TRAVEL MOTOR
ARM CYLINDER
BOOM CYLINDER
SWING MOTOR
HYD
TANK
FRONT
PUMP
REAR
PUMP
PILOT
PUMP
P1
P2
R
XBb2
XAb1
dr4
P1
Bb1
XBb1
XBb2
BUCKRT CYLINDER
XBa1
XBa2
XAa1
Pal
XBa2
XAa2
XAah
Ck1
XAk2
dr8
XAtl
XBtl
XAtr
XBtr
XAk
XBk
XAs
XBs
BOOM2
BOOM1
ARM1
ARM2
TRAVEL(LH)
TRAVEL(RH)
OPTION
BUCKET
SWING
dr2
XAas
Pi
CHECK
VALVE
ORIFICE
PILOT VALVE
STRAIGHT
TRAVEL SPOOL
XAa2
XAah
ARM HALF SOLENOID VALVE
When the arm and travel functions are operated, simultaneously the arm spools and travel spools in
the main control valve are moved to the functional position by the pilot oil pressure from the remote
control valve and the spool of pilot valve is pushed to the downward by the pilot oil pressure from the
pilot pump. At the same time, the straight travel spool is pushed to the left by the oil through the pilot
valve for straight travel. The oil from the rear pump flows into the arm cylinders through the arm 1
spool and arm 2 spool via the parallel and confluence oil passage. The oil from the front pump
flows into the travel motors through the RH travel spool of the right control valve and the LH travel
spool of the left control valve via the straight travel spool.
Check valve the pressure in the travel circuit can be high while the arm pressure is low. When the
travel circuit pressure drops lower than arm pressure, as when traveling downhill, arm priority and
smoothness are maintained because of the orifice. In either case, the machine will continue to travel
straight.
8. COMBINED ARM AND TRAVEL OPERATION
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...