8-30
2. STRUCTURE(1/2)
79
16
15
76
77
78
64
6
32
33
34
25
8
9
36
35
58
15
27
26
15
25
28
15
25
12
13
19
6
17
18
15
16
24
23
14
68
70
67
66
57
6
56
65
57
6
56
74
2
1
66
67
57
6
56
73
44
45
2 43
29
30
31
29
30
31
9
8
15
58
69
6
75
39
38
26
8
9
25
37
87
86
85
3
4
57
6
56
81
21
24
23
80
83
82
9
8
40
42
31
1
Cap
2
O-ring
3
Socket bolt
4
Spring washer
5
Overload assy
6
O-ring
7
Orifice
8
Cap
9
O-ring
10
Cover
11
Socket bolt
12
Sleeve
13
Check
14
Cap
15
O-ring
16
Cap
17
Spring
18
Spring guide
19
Spring guide
20
Cap
21
Spring
22
Check
23
Cap
24
O-ring
25
O-ring
26
O-ring
27
O-ring
28
Housing
29
O-ring
30
Retainer
31
Socket bolt
32
Plunger assy(TS)
33
Plunger assy
(TL, TR)
34
Plunger assy
(SW)
35
Plunger assy
(BM
2
)
36
Plunger assy
(AM
1
)
37
Cover assy
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...