8-38
Overload
relief valve
2
1
3
4
5
BOOM HOLDING VALVE ASSEMBLY
Loosen the socket bolt(1) and remove the
cover assy(2).
Ϧ
Tightening torque : 5kgf
ş
m(36.2lbf
ş
ft)
Install cover assy(2) after making sure
that O-ring is placed on the edge of the
valve hole.
Remove the spring guide(3), spring(4)
and poppet(5).
7)
(1)
Ɠ
(2)
8
6
7
Remove the cap(6), spring(7) and
spool(8).
Ϧ
Tightening torque : 3kgf
ş
m(21.7lbf
ş
ft)
(3)
Tools
Ϧ
Hexagon socket : 8mm
Ϧ
Torque wrench
Tools
Ϧ
Hexagon socket : 6mm
Ϧ
Torque wrench
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...