4 - 11
4. HEAD AND WORK LIGHT CIRCUIT
OPERATING FLOW
Fuse box(No.16) I/conn
ŭ
CN-1(R)
Ů
Main light switch
ŭ
CS-21(1)
Ů
Fuse box(No.17) Work light relay
ŭ
CR-3(2, 3)
Ů
Head light switch ON : 1st step
Head light switch ON
ŭ
CS-21(5)
Ů
I/conn
ŭ
CN-1(O)
Ů
Head light ON
ŭ
CL-3(2)
Ů
Cluster illumination lamp
ŭ
CN-52(4)
Ů
Switch indicator lamp ON
ŭ
CS-21(9)
Ů
Work light switch ON : 2nd step
Work light switch ON
ŭ
CS-21(2)
Ů
I/conn
ŭ
CN-1(Q)
Ů
Work light relay
ŭ
CR-3(1)
Ů
I/conn
ŭ
CN-10(2)
Ů
Work light ON
ŭ
CL-6(2), CL-5(2)
Ů
Cluster work light pilot lamp ON
ŭ
CN-52(8)
Ů
CHECK POINT
(1)
(2)
Engine
Start switch
Check point
Voltage
STOP
ON
ڸ
- GND(Fuse box)
ں
- GND(Switch power input)
ڼ
- GND(Switch power output)
ھ
- GND(Head lamp)
ڹ
- GND(Fuse box)
ڻ
- GND(Switch signal input)
ڽ
- GND(Switch signal output)
ڿ
- GND(Relay coil)
ۀ
- GND(Relay power input)
ہ
- GND(Relay power output)
ۂ
- GND(Work lamp)
20~25V
STOP
ON
20~25V
Ɠ
GND : Ground
2)
1)
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...