8 - 133
2. CARRIER ROLLER
REMOVAL
Loosen tension of the track link.
Jack up the track link height enough to
permit carrier roller removal.
Loosen the lock nut (1).
Open bracket(2) with a screwdriver, push
out from inside, and remove carrier roller
assembly.
ş
Weight : 20.6kg(45.4lb)
INSTALL
Carry out installation in the reverse order
to removal.
(1)
(2)
(3)
(4)
(1)
1)
2)
Frame
Jack
1
2
Carrier roller
Carrier
roller
Grease
valve
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...