7 - 20
MAIN PUMP DELIVERY PRESSURE
Preparation
Stop the engine.
Remove the top cover of the hydraulic
tank oil supply port with a wrench.
Push the pressure release button to
bleed air.
To measure the main pump pressure.
Install a connector and pressure gauge
assembly main pump gauge port as
shown.
Start the engine and check for oil
leakage from the port.
Keep the hydraulic oil temperature at
50
Ź
5
Ş
C.
Measurement
Select the following switch positions.
Mode selector : H mode
Auto decel switch : OFF
Measure the main pump delivery
pressure in the H mode(High idle).
Evaluation
17)
(1)
(2)
ڸ
ş
ş
ڹ
ڸ
ڹ
ں
ڻ
ڼ
ڽ
The average measured pressure should meet the following specifications.
Unit : kgf / cm
2
Model
R160LC-3
Engine speed
High idle
Standard
30
*
5
Allowable limits
-
Remarks
(3)
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...