6 - 54
TEST PROCEDURE
Test 13 : Check voltage at CN-51(3) and
ground.
Prepare 1 piece of thin sharp pin, steel or
copper.
Starting key ON.
Insert prepared pin to rear side of
connectors : One pin to (3) of CN-50.
Check voltage as figure.
15
CPU
CONTROLLER
CN-50
12
11
10
9
1
2
3
17 18 19
Multimeter
CN-50
20 21 22
4
5
6
13 14
7
8
16
23 24
PIN
Ground
(1)
ڸ
ڹ
ں
ڻ
2)
SPEC : Actuator stop : 4.5~5.5V
Actuator operating : 0~2V
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...