8-34
PLUNGER
Loosen socket bolt(1) and remove cover
(2).
Ϧ
Tightening torque : 3kgf
Ϧ
m(21.7lbf
Ϧ
ft)
Install cover (2) after making sure that O-
ring is placed on the edge of the valve
hole.
(1)
Ɠ
Tools
Ϧ
Hexagon socket : 6mm
Ϧ
Torque wrench
Holder
Spring guide
Tools
Ϧ
Hexagon socket : 8mm
Ϧ
Torque wrench
3 2
1
3
4
5
4
3)
Remove plunger cap(3), spring guide(4)
and spring(5) in this order.
Place the plunger between holders and
loosen plunger cap(3) by using a vise.
Plunger cap
Hexagon socket : 8mm
Tightening torque : 6kgf
ş
m(43.4lbf
ş
ft)
Pull the plunger out while holding the
spring.
Do not pull it out violently, but draw it out
gently while making sure of its contact
with housing hole.
(2)
Ɠ
(3)
ş
(4)
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...