If Pc is higher than Pv(In the case of boom down operation)
When plunger moves to left, chamber(3) is connected with tank passage. At the same time,
spool(A) moves to right by the pressure of pilot signal ; Chamber(1) and drain port(dr4) are
connected.
Therefore, pressure of chamber(1) becomes low ; Pressure Pc is applied to(Area d
1
- area d
2
),
pushing open poppet(B), and return oil from the cylinder head side flows into the tank
passage.
1
3(Pv)
2(Pc)
4
5Pi
Pilot signal port
dr4
Bb1
From boom
cylinder head
Tank passage
High pressure
feed passage
Spool(A)
Poppet(B)
d1
d2
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...