8 - 132
1. TRACK LINK
REMOVAL
Move track link until master pin is over
front idler in the position put wooden
block as shown.
Loosen tension of the track link.
If track tension is not relieved when the
grease valve is loosened, move the
machine backwards and forwards.
Push out master pin by using a suitable
tool.
Move the machine slowly in reverse, and
lay out track link assembly (1).
Jack up the machine and put wooden
block under the machine.
Don't get close to the sprocket side as the
track shoe plate may fall down on your
feet.
INSTALL
Carry out installation in the reverse order
to removal.
Adjust the tension of the track link.
GROUP 10 UNDERCARRIAGE
1)
2)
(1)
(2)
Ɠ
(3)
(4)
Ɠ
Ɠ
(1)
Ɠ
Master pin
Wooden
block
1
90-110
Ɓ
Summary of Contents for R 160 LC-3
Page 9: ......
Page 142: ...4 4...
Page 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Page 397: ......
Page 398: ......
Page 399: ......
Page 400: ......
Page 401: ......
Page 402: ......
Page 403: ......
Page 404: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Page 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Page 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...