BF135A•BF150A
5-133
3) Set the five 8 x 35 mm flange bolts, two 8 mm washers and
the two 8 mm flange nuts.
4) Tighten the 8 x 35 mm flange bolts and the 8 mm flange
nuts in the numbered sequence in two or three steps to the
specified torque.
TORQUE: 26 N
•
m (2.7 kgf
•
m, 20 lbf
•
ft)
5) Install the new throttle body gasket on the intake manifold.
6) Install the throttle body and tighten the 8 x 60 mm flange
bolts in the numbered sequence in two or three steps
securely.
TORQUE: 22 N
•
m (2.2 kgf
•
m, 16 lbf
•
ft)
7) Install the throttle rod. Note the throttle rod installation direc-
tion. Don't loosen the lock nut of the throttle rod
8) Connect the IAB control valve 2P connector.
[1] 8 mm FLANGE NUT (2)
8 x 35 (3)
8 x 60 (4)
[2] 8 x 35 (2)
and 8 mm WASHER (2)
[1] THROTTLE BODY GASKET
[2] THROTTLE BODY
[1]
IAB CONTROL VALVE
2P CONNECTOR
[1] THROTTLE ROD