Issue 08/2013
Page 4
M
A
PL
A - M
odu
la
r e
ne
rg
y s
up
pl
y s
ys
te
m f
or l
oa
d li
ft
in
g m
ag
ne
ts
Legend, safety instructions
Contents
5 Installation and commissioning
5.4.1 Pre-assembled cables, supplied
5.4.2 Rules for cable installation
5.4.3 Requirements on the connection cables
Generator installation for iMAPLA 8, 13, 17 and 20
5.5.1 Requirements on the installation position
5.5.2 Permissible installation positions
5.5.4 Minimum clearances and cooling provisions
5.5.5 Assembly instructions for belt drive
5.5.6 Assembly instructions for flange mount SAE5
5.5.7 Assembly instructions for hydraulic drive
Generator installation for iMAPLA 25 and 30
5.6.1 Requirements on the installation position
5.6.2 Permissible installation position
5.6.3 Assembly (iMAPLA 25 and 30)
5.6.4 Minimum clearances and cooling provisions
5.6.5 Assembly instructions for belt drive
5.6.6 Assembly instructions for flange mount SAE5
5.6.7 Assembly instructions for hydraulic drive
Arrangement of the hydraulic drive
5.7.1 Calculation for hydro-drive for GTS iMAPLA generators
Installation of the switch box, construction type “External Unit”
5.8.1 Requirements on the installation position
5.8.2 Permissible installation site for a switch box
5.8.3 Installing the generator connection cable
Safety instructions for operation
MMI operating- and fault displays
Establish the system's readiness for use
Daily inspection of the insulation monitor
Set operating modes, normal mode and jog mode (machine handling and
6.6.1 Normal-/machine handling operation [A] (switch on top)
6.6.2 Jog / Sort mode [B] (switch setting below)
Operating in Normal or Material handling mode [A]
6.7.1 Lift load (switch on the lifting magnet)
6.7.2 Release load (switch off lifting magnet)
Operation in Jog mode / Sorting mode [B]