Issue 08/2013
Page 86
M
A
PL
A - M
odu
la
r e
ne
rg
y s
up
pl
y s
ys
te
m f
or l
oa
d li
ft
in
g m
ag
ne
ts
Installation and commissioning
Generator installation for iMAPLA 25 and 30
5.6.6
Assembly instructions for flange mount SAE5
Preparatory disassembly
Ö
Fig. 30, Preparatory disassembly of the flange mount SAE5
>
Unscrew and remove four grub screws M12 x 20
[1]
.
1(4x)
Fig. 30 Preparatory disassembly of the flange mount SAE5
(iMAPLA 25 and 30)
Assembly
Ö
Fig. 31, Assembly of flange mount SAE5 (
>
Place the flange
[1]
onto the generator and secure with four screws
[2a]
.
>
Apply Loctite to the screw thread and place a toothed washer
[2b]
underneath the screw head.
>
Mount the coupling plate
[3]
on the shaft at the generator and prevent it
from twisting on the shaft with a key.