Issue 08/2013
Page 64
M
A
PL
A - M
odu
la
r e
ne
rg
y s
up
pl
y s
ys
te
m f
or l
oa
d li
ft
in
g m
ag
ne
ts
Installation and commissioning
Installation of MMI
Construction type “External Unit” and Stand-Alone MMI
y
i
MAPLA Generator
y
Switch box
y
MMI
y
Connection cable, MMI switch box
y
Connection cable, switch box lifting magnet
y
Connection cable, MMI to control button
Construction type “External Unit” and MMI with radio modem
y
i
MAPLA Generator
y
Switch box
y
MMI with radio modem
y
Connection cable, switch box radio modem
y
Connection cable, switch box lifting magnet
y
Connection cable MMI to the control button / voltage supply
5.3
Installation of MMI
For information about the MMI installation, see the description of the MMI
used.
Ö
MMI plug connections (default assignment), page 31 for stand-alone
MMI
Ö
MMI with radio modem, page 147
5.4
Installation of cables
Before the installation of cables, carefully read the entire chapter as well as
the safety instructions in Chapter 2 and follow the given instructions and
regulations.
Ö
Connection and pin assignment
Ö
Overview of cables, System overview, page 19.
Ö
Plug connections on the generator and switch box, page 37
Ö
MMI control unit (stand-alone version), page 29
Ö