GE Multilin
T60 Transformer Protection System
5-159
5 SETTINGS
5.6 GROUPED ELEMENTS
5
Figure 5–74: GROUND DISTANCE ZONE 2 OP SCHEME
For ground distance zone 2, there is a provision to start the zone timer with the other distance zones or loop pickup
flags to avoid prolonging ground distance zone 2 operation if the fault evolves from one type to another or migrates
from zone 3 or 4 to zone 2. The desired zones should be assigned in the trip output element to accomplish this
functionality.
Figure 5–75: GROUND DISTANCE ZONES 3 AND HIGHER OP SCHEME
25
$1'
25
$&'5
IURPWKHRSHQSROHGHWHFWRUHOHPHQW'/DQG/RQO\
)/(;/2*,&23(5$1'
23(132/(23
)/(;/2*,&23(5$1'
*1'',67=3.3$
)/(;/2*,&23(5$1'
*1'',67=3.3%
)/(;/2*,&23(5$1'
*1'',67=3.3&
7,0(5
PV
PV
7,0(5
PV
PV
7,0(5
PV
PV
6(77,1*
*1'',67='(/$<
7
3.3
6(77,1*
*1'',67='(/$<
7
3.3
6(77,1*
*1'',67='(/$<
7
3.3
)/(;/2*,&23(5$1'
*1'',67=23$
)/(;/2*,&23(5$1'
*1'',67=23%
)/(;/2*,&23(5$1'
*1'',67=23&
)/(;/2*,&23(5$1'
*1'',67=23
)/(;/2*,&23(5$1'
75,3=*5705,1,7
25
25
25
$1'
25
$1'
25
$1'
$1'
$1'
IURPWKHWULSRXWSXWHOHPHQW
NOTE
25
$1'
$1'
$1'
25
25
25
$$&'5
'/DQG/RQO\
)/(;/2*,&23(5$1'
23(132/(23
)/(;/2*,&23(5$1'
*1'',67=3.3$
)/(;/2*,&23(5$1'
*1'',67=3.3%
)/(;/2*,&23(5$1'
*1'',67=3.3&
7,0(5
PV
PV
7,0(5
PV
PV
7,0(5
PV
PV
6(77,1*
*1'',67='(/$<
7
3.3
6(77,1*
*1'',67='(/$<
7
3.3
6(77,1*
*1'',67='(/$<
7
3.3
)/(;/2*,&23(5$1'
*1'',67=23$
)/(;/2*,&23(5$1'
*1'',67=23%
)/(;/2*,&23(5$1'
*1'',67=23&
)/(;/2*,&23(5$1'
*1'',67=23
Summary of Contents for UR T60
Page 10: ...x T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Page 14: ...xiv T60 Transformer Protection System GE Multilin 0 1 BATTERY DISPOSAL 0 BATTERY DISPOSAL 0 ...
Page 34: ...1 20 T60 Transformer Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 436: ...5 298 T60 Transformer Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 678: ...C 30 T60 Transformer Protection System GE Multilin C 7 LOGICAL NODES APPENDIX C C ...
Page 688: ...D 10 T60 Transformer Protection System GE Multilin D 1 IEC 60870 5 104 PROTOCOL APPENDIX D D ...
Page 700: ...E 12 T60 Transformer Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...