GE M
EDICAL
S
YSTEMS
D
IRECTION
2380207
, R
EVISION
7
LOGIQ™ 5 PRO S
ERVICE
M
ANUAL
8 - 164
Section 8-9 - Power Block
3.) Disconnect one (1) connector (J1) from the JPC Assy. Refer to Figure 8-183.
4.) Unscrew two (2) ground screws (7-8). Refer to Figure 8-184.
5.) Remove the AC Power Box.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-9-5-5
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-183 Disconnect 1 connector
Figure 8-184 Unscrew two ground screws
Table 8-53 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
2380207
, Rev 7+, Section 8-9-5. Equipment
passed all required tests and is ready for use. “
AC Power Box function check procedure
J1
(7)
(8)
AC POWER BOX VIEW
Summary of Contents for LOGIQ 5 PRO
Page 2: ...GE MEDICAL SYSTEMS DIRECTION 2407381 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL Page 1 2 ...
Page 3: ......
Page 7: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL ii iii ...
Page 462: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL A 4 Index INDEX ...