GE M
EDICAL
S
YSTEMS
D
IRECTION
2380207
, R
EVISION
7
LOGIQ™ 5 PRO S
ERVICE
M
ANUAL
8 - 162
Section 8-9 - Power Block
6.) Unscrew four (4) ground screws (5-8). Refer to Figure 8-180.
7.) Unscrew one nut in the Center top of the Transformer. Refer to Figure 8-181.
8.) Remove the Transformer Assy.
9.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-9-4-5
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-180 Unscrew 4 screws
Figure 8-181 Removing the Transformer
Table 8-52 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
2380207
, Rev 7+, Section 8-9-4. Equipment
passed all required tests and is ready for use. “
Transformer function check procedure
(5) (6)
(7) (8)
Summary of Contents for LOGIQ 5 PRO
Page 2: ...GE MEDICAL SYSTEMS DIRECTION 2407381 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL Page 1 2 ...
Page 3: ......
Page 7: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL ii iii ...
Page 462: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL A 4 Index INDEX ...