GE M
EDICAL
S
YSTEMS
D
IRECTION
2380207
, R
EVISION
7
LOGIQ™ 5 PRO S
ERVICE
M
ANUAL
Chapter 8 Replacement Procedures
8 - 3
3.) Remove 3Connectors (CN1 - CN3) from the Monitor. Refer to Figure 8-2.
4.) Lift the Monitor Assy upward. Refer to Figure 8-3
.
5.) Remove the Monitor Cover set. Refer to section 8-3-3 on page 8.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-3-1-5
Mounting procedure
Install the new parts in the reverse order of removal.
Figure 8-2 Disconnect three(3) connectors
Figure 8-3 Lifting the Monitor Assy Upward
Table 8-2
Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
2380207
, Rev 7+, Section 8-3-1. Equipment
passed all required tests and is ready for use. “
CRT Assy function check procedure
Section 10-5-2
Functional Checks (See Also Chapter 4)
Three Connectors
CN1
CN2
CN3
1
CN1
CN2
CN3
Summary of Contents for LOGIQ 5 PRO
Page 2: ...GE MEDICAL SYSTEMS DIRECTION 2407381 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL Page 1 2 ...
Page 3: ......
Page 7: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL ii iii ...
Page 462: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL A 4 Index INDEX ...