GE M
EDICAL
S
YSTEMS
D
IRECTION
2380207
, R
EVISION
7
LOGIQ™ 5 PRO S
ERVICE
M
ANUAL
Chapter 8 Replacement Procedures
8 - 163
8-9-5
AC Power Box (FRU No. 704)
Purpose: This is a description on how to remove and replace the AC Power Box.
8-9-5-1
Tools
•
Common pillips screwdrivers
•
Allen/Unbraco wrench
8-9-5-2
Needed Manpower
•
1 person, 15 m travel
8-9-5-3
Preparations
•
Shut Down the System and switch off the Main Breaker at the rear as described in section 4-3-2 on
•
AC Power Assy should be removed before proceed. Refer to AC POWER ASSY DISASSEMBLY
on page 8 - 82.
8-9-5-4
Removal Procedure
1.) Unscrew six screws (1-6) and remove the AC Power Box cover. Refer to Figure 8-182.
2.) Remove the AC Power left side cover.
CAUTION
Do not wear the ESD wrist strap when you remove a part of power supply unit. Turn OFF power
and unplug the power cord before removing a part of power supply unit. However be sure to turn
off power and wear the strap before you remove a circuit boards.
Figure 8-182 Unscrew 6 screws to remove AC Power Box
AC Power Box Cover
Summary of Contents for LOGIQ 5 PRO
Page 2: ...GE MEDICAL SYSTEMS DIRECTION 2407381 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL Page 1 2 ...
Page 3: ......
Page 7: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL ii iii ...
Page 462: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL A 4 Index INDEX ...