![background image](http://html.mh-extra.com/html/ge/druck-adts-505/druck-adts-505_user-manual_132652032.webp)
3 - 4
Operation
K0260 Issue No. 8
3.4
First Time Operators
The following sequences of operation should be used by first time operators and by operators that
use the equipment occasionally. For regular users, familiar with the equipment, go to section 3.5.
Set the power supply switch to ON and the power-on routine starts.
(1)
The display first shows:
(2)
After approximately five seconds the display shows
the start of the power-on sequence, the system
carries out a self test. If the test finds a fault, the
display shows an error message, refer to Section 5,
Fault Finding and Testing.
(3)
The display messages show a sequence of
pneumatic and internal system checks:
(4)
After a successful self-test sequence the system changes to measure mode. The display changes
to the Leak Measure mode display showing the parameters selected in set-up.
ALT
Ps
SPEED
Qc
MACH
Pt
ROC
RATE Ps
GROUND
RATE
7
F6
F5
F4
F3
F2
F1
4
1
_
000
8
5
2
0
9
6
3
.
CLEAR
QUIT
ABORT
DELETE
ENTER
LEAK
MEASURE
CONTROL
HELP
SETUP
SYSTEM STARTING
PLEASE WAIT
ALT
Ps
S
PEED
Qc
MACH
Pt
ROC
RATE Ps
GROUND
RATE
7
F6
F5
F4
F3
F2
F1
4
1
_
000
8
5
2
0
9
6
3
.
CLEAR
QUIT
ABORT
DELETE
ENTER
LEAK
MEA
S
URE
CONTROL
HELP
S
ETUP
ADT
S
505
Software Version 1.06
LAST CALIBRATED [DD/MM/YYYY]
THERMAL TEST PLEASE WAIT
ALT
Ps
S
PEED
Qc
MACH
Pt
ROC
RATE Ps
GROUND
RATE
7
F6
F5
F4
F3
F2
F1
4
1
_
000
8
5
2
0
9
6
3
.
CLEAR
QUIT
ABORT
DELETE
ENTER
LEAK
MEA
S
URE
CONTROL
HELP
S
ETUP
Software Version 1.06
LAST CALIBRATED [DD/MM/YYYY]
CHECKING FOR VACUUM LEAKS
ADT
S
505
ALT
Ps
S
PEED
Qc
MACH
Pt
ROC
RATE Ps
GROUND
RATE
7
F6
F5
F4
F3
F2
F1
4
1
_
000
8
5
2
0
9
6
3
.
CLEAR
QUIT
ABORT
DELETE
ENTER
LEAK
MEA
S
URE
CONTROL
HELP
S
ETUP
Software Version 1.06
LAST CALIBRATED [DD/MM/YYYY]
CHECKING FOR PRESSURE LEAKS
ADT
S
505
ALT
Ps
S
PEED
Qc
MACH
Pt
ROC
RATE Ps
GROUND
RATE
7
F6
F5
F4
F3
F2
F1
4
1
_
000
8
5
2
0
9
6
3
.
CLEAR
QUIT
ABORT
DELETE
ENTER
LEAK
MEA
S
URE
CONTROL
HELP
S
ETUP
Software Version 1.06
LAST CALIBRATED [DD/MM/YYYY]
PRESSURIZING PUMPS
ADT
S
505
ALT
Ps
S
PEED
Qc
MACH
Pt
ROC
RATE Ps
GROUND
RATE
7
F6
F5
F4
F3
F2
F1
4
1
_
000
8
5
2
0
9
6
3
.
CLEAR
QUIT
ABORT
DELETE
ENTER
LEAK
MEA
S
URE
CONTROL
HELP
S
ETUP
KEEP SIDE AIR VENTS CLEAR
FINDING VALVE BIAS 1 OF 4 . . .
ADT
S
505
ALT
Ps
S
PEED
Qc
MACH
Pt
ROC
RATE Ps
GROUND
RATE
7
F6
F5
F4
F3
F2
F1
4
1
_
000
8
5
2
0
9
6
3
.
CLEAR
QUIT
ABORT
DELETE
ENTER
LEAK
MEA
S
URE
CONTROL
HELP
S
ETUP
KEEP SIDE AIR VENTS CLEAR
GROUND SENSORS
ADT
S
505
ALT
Ps
S
PEED
Qc
MACH
Pt
ROC
RATE Ps
GROUND
RATE
7
F6
F5
F4
F3
F2
F1
4
1
_
000
8
5
2
0
9
6
3
.
CLEAR
QUIT
ABORT
DELETE
ENTER
LEAK
MEA
S
URE
CONTROL
HELP
S
ETUP
KEEP SIDE AIR VENTS CLEAR
OPEN VALVES
ADT
S
505
Summary of Contents for Druck ADTS 505
Page 1: ...GE Measurement Control Druck ADTS 505 Air Data Test Set User Manual K0260 ...
Page 14: ...xii K0260 Issue No 8 Druck ADTS 505 User Manual ...
Page 54: ...3 26 Operation K0260 Issue No 8 ...
Page 55: ...Druck ADTS 505 User Manual 3 27 K0260 Issue No 8 3 ...
Page 56: ...3 28 Operation K0260 Issue No 8 ...
Page 66: ...5 4 Testing and Fault Finding K0260 Issue No 8 FIGURE 5 1 FAULT FINDING CHART ...
Page 80: ...5 18 Testing and Fault Finding K0260 Issue No 8 Intentionally left blank ...
Page 124: ...6 44 Reference and Specification K0260 Issue No 8 Intentionally left blank ...