Section 6: 9100 System Operation — SCPI Language
6-27
Final Width = 215mm
6.6.2.5
CAL:TRIG?
Purpose
After the parameters are set for calibration at a single calibration point, this command initiates the internal calibration process.
Response
If the calibration operation is a success then the command returns a
'0'
. If the process fails for any reason, then a
'1'
is returned
and an error message is put in the error queue.
6.6.2.6
CAL:SPEC?
Purpose
This command characterizes the instrument's main Digital-to-Analog Converter.
Response
The process takes approximately 15 minutes to complete. If the characterization operation is a success then the command returns
a
'0'
. If the process fails for any reason, then a
'1'
is returned and an error message is put in the error queue.
6.6.2.7
CAL:CJUN? <dnpd>
Purpose
To obtain a calibration factor from an external measurement of the temperature of the reference junction in its pod, and a similar
internal measurement which is triggered by this command..
The
<dnpd>
MUST be supplied and should be the externally-measured temperature of the pod.
For successful calibration, the pod MUST be fitted and the external measurement MUST be supplied with the command.
This is the remote equivalent of the manual calibration of the pod detailed in Section 10, paras 10.2.5. Identification of the
association of the pod with a particular host 9100 unit should be recorded as for the manual case (paras 10.2.5.7)
Response
If the calibration operation is a success then the command returns a
'0'
. If the process fails for any reason, then a
'1'
is returned
and an error message is put in the error queue.