6-
Place the starter
assembly
in position
on
the
engine
and
start
the
two
upper
screws
through
the
upper
bearing
support.
Check to be sure the guide is in place in the
bottom
and top retainers.
Tighten
the
two
bottom
retainer
screws.
Alternate
Assembling
Method
lA-
If the lower
bushing was removed,
install a
NEW
bushing into the bottom
collar
on the engine.
HELPFUL
WORD
As an assist to installation,
first soak the
bushing in hot water
for about
ten minutes,
and
then
lubricate
it
with
just
a dorp of
outboard
oil.
2A-
Install
the spring
retainer
from the
bottom
side of the spool.
Slip the
bearing
head
and pinion gear down the spool shaft.
Align
the
holes
and
install
the
roll
pin
through the pinion gear and spool.
3A-
Take
the
spring
and lower
it
into
the bottom
retainer.
Hook the outer
spring
into the retainer.
PINION GEAR 5
&
6 HP
9-9
Summary of Contents for 4906B 4HP 1969
Page 5: ......
Page 87: ...3 46 POWERHEAD Exploded drawing of a 7 5 hp powerhead 1956 58 with principle parts identified...
Page 88: ...CYLINDER BLOCK 3 47 HEAD GASKET RING...
Page 90: ...CYLINDER BLOCK 3 49 THERMOSTAT EXHAUST COVER The...
Page 137: ...4 46 FUEL LEVER AND LOW SPEED...
Page 153: ...4 62 FUEL Exploded view of a pressure tyoe fuel tank with major parts identified...
Page 157: ...4 66 fUEL...
Page 412: ...A 16 APPENDIX Wire Identification 33 hp with Generator 1965 67...
Page 413: ...APPENDIX A 17 o C...
Page 414: ...Wire Identification 33 hp with Generator 1969 70...
Page 415: ...APPENDIX A 19 Wire Identification 35 hp 1957 59...
Page 416: ...A 20 APPENDIX Wire Identification 40 hp Standard Shift with Generator 1960 66...
Page 417: ...APPENDIX A 21 UJ cc b Wire Identification 40 hp Standard Shift with Generator 1967 68...
Page 419: ...APPENDIX Wire Identification 40 hp Electric Shift with Generator 1961 66 A 23...
Page 420: ...A 24 APPENDIX C 00 Wire Identification 40 hp Electric Shift with Generator 1967 68...
Page 421: ...Wire Identification 40 hp Electric Shift with Generator 1969 70...
Page 422: ...NOTES NUMBERS...