Section 5 — Service and Maintenance
5-2
Part No. 750-263
On an annual basis the boiler vessel and burner combustion system
must be checked and cleaned. This work is to be carried out by an
authorized Cleaver-Brooks Service Technician.
A. CLEANING PROCEDURE / DISASSEMBLY
1.
Close off the gas supply to the boiler and disconnect electrical
power at the primary switch box.
2.
Remove the top cover of the boiler.
3.
Disconnect the gas piping to the burner head.
4.
Disconnect the electrical connections to the blower assembly.
5.
Remove air combustion piping if supplied.
6.
Unscrew the four- (4) hold down nuts securing the burner door
to the pressure vessel.
7.
The burner door, burner head, blower motor and assembly will
lift on the provided gas struts (see
Figure 5-2
).
8.
The blower motor and gas valve assembly assembly can be
removed from the boiler.
9.
The burner head can be separated from the head assembly by
removing 4 bolts and washers.
Check the burner head for any damage, burn marks or perforations.
If damage is determined replace the damaged parts. If the canister
is in good condition clean out any dirt and contaminates with a
vacuum cleaner inside and out alternating with compressed air to
dislodge any debris of combustion.
1.
With the burner head and blower removed the combustion
chamber can be accessed for all service requirements.
2.
Check ignition and ionization electrodes for deposits and proper
gap. Clean or replace as needed.
3.
Inspect the pressure vessel and combustion chamber area for
any damage or contamination (see
Figure 5-3
). If dirt or
contaminates are found it is recommended that the tubes be
washed with a high-pressure power washer.
Figure 5-1 Burner Head (in
place)
A. Gas Assist lift cylinders (2)
B. Burner head hold down nuts
A
B
B
B
(BOTH SIDES)
Figure 5-2 Burner Door
!
Caution
Label all wires prior to disconnection when servicing controls.
Wiring errors can cause improper and dangerous operation.
Verify proper operation after servicing.
Summary of Contents for CFC-1000
Page 35: ...Section 2 Installation Part No 750 263 2 21 Figure 2 23 Gas Piping ...
Page 47: ...Section 2 Installation Part No 750 263 2 33 Figure 2 41 Electrical Connection Diagram ...
Page 49: ...Section 2 Installation Part No 750 263 2 35 Figure 2 43 CFC Wiring Diagram dual fuel units ...
Page 50: ...Section 2 Installation 2 36 Part No 750 263 ...
Page 70: ...Section 3 Stack and Intake Vent Sizing and Installation 3 20 Part No 750 263 ...
Page 102: ...Section 4 CFC Commissioning 4 32 Part No 750 263 ...
Page 108: ...Section 5 Service and Maintenance 5 6 Part No 750 263 ...
Page 113: ...Section 6 Parts Part No 750 263 6 5 Figure 6 3 Casing Table 6 5 Casing parts ...
Page 117: ...Section 6 Parts Part No 750 263 6 9 Figure 6 7 Electrical assemblies single fuel ...
Page 123: ...APPENDIX A CB FALCON CONTROLLER ...
Page 124: ......
Page 244: ...CB FALCON 750 265 120 ...
Page 245: ...APPENDIX B CB FALCON PLUG IN MODULE ...
Page 246: ......
Page 250: ......
Page 251: ...APPENDIX C GAS VALVE ...
Page 252: ......
Page 269: ...APPENDIX D CB FALCON MODBUS COMMUNICATION ...
Page 270: ......