Section 3 — Stack and Intake Vent Sizing and Installation
Part No. 750-263
3-17
Figure 3-7. One Opening Method
2. Air Supply - Engineered Method
When determining boiler room air requirements for an unconfined
space, the size of the room, airflow, and velocity of air must be
reviewed as follows:
1. Size (area) and location of air supply openings in the boiler
room.
A. Two permanent air supply openings in the outer walls of the
boiler room are recommended. Locate one at each end of
the boiler room, preferably below a height of 7 feet. This
allows air to sweep the length of the boiler. See
Figure 3-8
.
B. Air supply openings can be louvered for weather protection,
but they should not be covered with fine mesh wire, as this
type of covering has poor air flow qualities and is subject to
clogging with dirt and dust.
C. A vent fan in the boiler room is not recommended, as it could
create a slight vacuum under certain conditions and cause
variations in the quantity of combustion air. This can result
in unsafe burner performance.
D. Under no condition should the total area of the air supply
openings be less than one square foot.
GAS
VENT
CLEARFIRE
BOILER
WATER
HEATER
GAS
VENT
EXTERIOR WALL
FRESH AIR OPENING
12" MINIMUM
Summary of Contents for CFC-1000
Page 35: ...Section 2 Installation Part No 750 263 2 21 Figure 2 23 Gas Piping ...
Page 47: ...Section 2 Installation Part No 750 263 2 33 Figure 2 41 Electrical Connection Diagram ...
Page 49: ...Section 2 Installation Part No 750 263 2 35 Figure 2 43 CFC Wiring Diagram dual fuel units ...
Page 50: ...Section 2 Installation 2 36 Part No 750 263 ...
Page 70: ...Section 3 Stack and Intake Vent Sizing and Installation 3 20 Part No 750 263 ...
Page 102: ...Section 4 CFC Commissioning 4 32 Part No 750 263 ...
Page 108: ...Section 5 Service and Maintenance 5 6 Part No 750 263 ...
Page 113: ...Section 6 Parts Part No 750 263 6 5 Figure 6 3 Casing Table 6 5 Casing parts ...
Page 117: ...Section 6 Parts Part No 750 263 6 9 Figure 6 7 Electrical assemblies single fuel ...
Page 123: ...APPENDIX A CB FALCON CONTROLLER ...
Page 124: ......
Page 244: ...CB FALCON 750 265 120 ...
Page 245: ...APPENDIX B CB FALCON PLUG IN MODULE ...
Page 246: ......
Page 250: ......
Page 251: ...APPENDIX C GAS VALVE ...
Page 252: ......
Page 269: ...APPENDIX D CB FALCON MODBUS COMMUNICATION ...
Page 270: ......