6. Attach the boiler front legs.
7. Lift up the back of the boiler using the jack and remove the wooden skid
side beams.
8. Attach the rear boiler mounting legs.
9. Lifting eyes are provided for moving and positioning the boiler.
10.Before installing insulation, level the boiler using a level placed against
the side of the vessel.
11.Wrap insulation blanket around pressure vessel. Ensure all pre-cut holes
fit completely over boiler fittings (
Figure 2-4
) and blanket is snug to the
vessel.
12.Peel backing from any excess length of insulation. Tuck excess portion
under other end of blanket. Place backing over overlapping segments
(
Figure 2-5
) and proceed with step 13.
13.Use tension springs to hold edges of blanket together. Poke end of spring
through the fabric of the insulation blanket (
Figure 2-6
). Place one spring
at the top and one at the bottom of the blanket. Place the remaining two
springs equally spaced.
14.Fit one end of black plastic strap to the fastener (
Figure 2-7
). Wrap strap
around the boiler and connect other end to fastener. Repeat with second
strap. Tighten straps so blanket is snug, but do not overtighten. Do not
compress insulation. Position the straps at ¼ and ¾ height.
Figure 2-4
Figure 2-5
Figure 2-6
Summary of Contents for CFC-1000
Page 35: ...Section 2 Installation Part No 750 263 2 21 Figure 2 23 Gas Piping ...
Page 47: ...Section 2 Installation Part No 750 263 2 33 Figure 2 41 Electrical Connection Diagram ...
Page 49: ...Section 2 Installation Part No 750 263 2 35 Figure 2 43 CFC Wiring Diagram dual fuel units ...
Page 50: ...Section 2 Installation 2 36 Part No 750 263 ...
Page 70: ...Section 3 Stack and Intake Vent Sizing and Installation 3 20 Part No 750 263 ...
Page 102: ...Section 4 CFC Commissioning 4 32 Part No 750 263 ...
Page 108: ...Section 5 Service and Maintenance 5 6 Part No 750 263 ...
Page 113: ...Section 6 Parts Part No 750 263 6 5 Figure 6 3 Casing Table 6 5 Casing parts ...
Page 117: ...Section 6 Parts Part No 750 263 6 9 Figure 6 7 Electrical assemblies single fuel ...
Page 123: ...APPENDIX A CB FALCON CONTROLLER ...
Page 124: ......
Page 244: ...CB FALCON 750 265 120 ...
Page 245: ...APPENDIX B CB FALCON PLUG IN MODULE ...
Page 246: ......
Page 250: ......
Page 251: ...APPENDIX C GAS VALVE ...
Page 252: ......
Page 269: ...APPENDIX D CB FALCON MODBUS COMMUNICATION ...
Page 270: ......