Section 4 — CFC Commissioning
4-6
Part No. 750-263
certain operator actions, out-of-range configuration data, controller
internal status reports (e.g. timers, counters, memory read/write
activity), and recycle events. Alerts require no operator
acknowledgment and are for informational purposes only.
The most recently occurring message (Lockout, Hold, or Alert) is
displayed in the alarm banner on the Status screen (see
Figure 4-
7
). Press this banner to access the Alert or Lockout History, where
a list of the most recently occurring Alerts/Lockouts can be viewed.
To obtain more information for a particular message, press that item
in the respective history list. For Alerts, burner cycle and hours of
operation at the time of occurrence will be displayed. For Lockouts,
in addition to cycle and hours the screen will show on/off status of
all interlocks at the time of the lockout. This information can be
used to help pinpoint the cause of a particular Lockout.
See also Chapter 5, Section E -
Troubleshooting
.
F. CONTROLLER CONFIGURATION
The CB Falcon controller should be factory configured for the
specific CFC boiler model. Prior to starting the boiler, verify that the
factory default settings are correct for your application. Please refer
to CB default settings, Table 4-1, and make any changes at this time
if needed.
CB Falcon configuration is grouped into the following functional
groups:
• System Identification & Access
• CH - Central Heat ConfigurCation
• Outdoor Reset Configuration
• DHW - Domestic Hot Water Configuration
• Modulation Configuration
• Pump Configuration
• Statistics Configuration
• High Limits
• Stack Limit
• Other Limits
• Anti-condensation Configuration
• Frost Protection Configuration
• Annunciation Configuration
Figure 4-7 Alarm Banner
Alarm Banner
Summary of Contents for CFC-1000
Page 35: ...Section 2 Installation Part No 750 263 2 21 Figure 2 23 Gas Piping ...
Page 47: ...Section 2 Installation Part No 750 263 2 33 Figure 2 41 Electrical Connection Diagram ...
Page 49: ...Section 2 Installation Part No 750 263 2 35 Figure 2 43 CFC Wiring Diagram dual fuel units ...
Page 50: ...Section 2 Installation 2 36 Part No 750 263 ...
Page 70: ...Section 3 Stack and Intake Vent Sizing and Installation 3 20 Part No 750 263 ...
Page 102: ...Section 4 CFC Commissioning 4 32 Part No 750 263 ...
Page 108: ...Section 5 Service and Maintenance 5 6 Part No 750 263 ...
Page 113: ...Section 6 Parts Part No 750 263 6 5 Figure 6 3 Casing Table 6 5 Casing parts ...
Page 117: ...Section 6 Parts Part No 750 263 6 9 Figure 6 7 Electrical assemblies single fuel ...
Page 123: ...APPENDIX A CB FALCON CONTROLLER ...
Page 124: ......
Page 244: ...CB FALCON 750 265 120 ...
Page 245: ...APPENDIX B CB FALCON PLUG IN MODULE ...
Page 246: ......
Page 250: ......
Page 251: ...APPENDIX C GAS VALVE ...
Page 252: ......
Page 269: ...APPENDIX D CB FALCON MODBUS COMMUNICATION ...
Page 270: ......