3. Operation Page
The operation page displays the CB Falcon running operation,
including setpoint and firing rate values. From this page the user
can change setpoints, manually control the boiler ’s firing rate,
manually turn pumps on, view annunciation information, and
switch between heating loops (Central Heat and Domestic Hot
Water). If a password is required to change any of the settings on
this page, the user can press the Login button to enter the
password.
The burner is enabled from this page by turning the <Burner
switch> screen button ON (see
Figure 4-5
).
Figure 4-6 Falcon Display/Interface page flow
4. Lockouts, Holds, and Alerts
To assist in monitoring boiler operation, the CB Falcon control
system employs messages of three types:
Lockouts
,
Holds
,
and
Alerts
.
•
Lockouts
and
Holds
indicate interruptions in boiler operation,
whether occurring as part of the normal operating sequence or due
to an abnormal condition. Lockouts require a manual reset to
continue operation, while Holds do not. A Hold will automatically
clear when the hold condition is removed or satisfied.
The most recent Lockouts are stored in CB Falcon memory and may
be accessed through the Lockout History. Holds are not logged in
memory.
Note:
Before attempting to restart the boiler after a Lockout,
identify and correct the Lockout condition.
•
Alerts
indicate conditions or events which, while not preventing
boiler operation, may nevertheless be of interest in evaluating
boiler performance or operating conditions. Examples include
Figure 4-5 Operation Page
HOME
PAGE
CONFIGURATION
MENU
SAFETY
VERIFICATION
CONFIGURATION
GROUP
CONFIGURATION
GROUP
CONFIGURATION
GROUP
STATUS
SUMMARY
PASSWORD
DIAGNOSTICS
STATUS
DETAIL
OPERATION
Summary of Contents for CFC-1000
Page 35: ...Section 2 Installation Part No 750 263 2 21 Figure 2 23 Gas Piping ...
Page 47: ...Section 2 Installation Part No 750 263 2 33 Figure 2 41 Electrical Connection Diagram ...
Page 49: ...Section 2 Installation Part No 750 263 2 35 Figure 2 43 CFC Wiring Diagram dual fuel units ...
Page 50: ...Section 2 Installation 2 36 Part No 750 263 ...
Page 70: ...Section 3 Stack and Intake Vent Sizing and Installation 3 20 Part No 750 263 ...
Page 102: ...Section 4 CFC Commissioning 4 32 Part No 750 263 ...
Page 108: ...Section 5 Service and Maintenance 5 6 Part No 750 263 ...
Page 113: ...Section 6 Parts Part No 750 263 6 5 Figure 6 3 Casing Table 6 5 Casing parts ...
Page 117: ...Section 6 Parts Part No 750 263 6 9 Figure 6 7 Electrical assemblies single fuel ...
Page 123: ...APPENDIX A CB FALCON CONTROLLER ...
Page 124: ......
Page 244: ...CB FALCON 750 265 120 ...
Page 245: ...APPENDIX B CB FALCON PLUG IN MODULE ...
Page 246: ......
Page 250: ......
Page 251: ...APPENDIX C GAS VALVE ...
Page 252: ......
Page 269: ...APPENDIX D CB FALCON MODBUS COMMUNICATION ...
Page 270: ......