I. SELECTING THE SITE
Make sure of the following when selecting the site of installation; if possible, pay a
visit to the user’s before delivery of the machine.
1. The site must provide an exclusive power source (rating ±10%), enabling proper
grounding.
2. The site must be 7.5° to 32.5°C/45.5° to 90.5°F in temperature and 5% to 85% RH
in humidity. Avoid areas near water faucets, water boiler, humidifier, or refrigerator.
3. Avoid areas near a source of fire or subject to dust or ammonia gas; as necessary,
provide curtains to protect against direct rays of the sun.
4. Be sure that the room is well ventilated; the amount of ozone generated by the
machine is of a level which is harmless to the health of the people working around it.
Some, nevertheless, find the odor not pleasant when working long hours.
5. Be sure that none of the feet of the copier is off the floor. The machine must remain
level at all times.
6. Keep the machine at least 10 cm/3.9 in away from the wall to allow ample space for
operation.
COPYRIGHT © 1997 CANON INC. CANON NP6350/NP6251 REV. 0 JULY 1997 PRINTED IN JAPAN (IMPRIME AU JAPON)
CHAPTER 9 INSTALLATION
9-1