
2-24 General Description
POWER Switch
Use the POWER switch to turn on/off the server.
Power On
Press the POWER switch on the front of the computer chassis.
The POWER LED lights in green.
POWER LED
POWER
switch
IMPORTANT:
If the power cord is connected to a power control device such as a UPS (Uninterruptive Power
Supply), make sure that the power control device is powered.
The server management logic on your system board monitors and logs system voltage changes.
When plugging the power cord to the system, you may experience 30 seconds delay from the
time you press the POWER switch on the front panel. This is normal system operation and is
required by the server management logic.
Always allow POST to complete before powering down your system.
Summary of Contents for NovaScale R460 E2
Page 1: ...NovaScale R460 E2 User s Guide NOVASCALE REFERENCE 86 A1 47FB 00...
Page 2: ......
Page 8: ......
Page 21: ...Notes on Using Your Server 1 3 Internal View...
Page 34: ...1 16 Notes on Using Your Server This page is intentionally left blank...
Page 392: ...9 96 Upgrading Your Server This page is intentionally left blank...
Page 402: ......
Page 404: ...C 2 IRQ This page is intentionally left blank...
Page 429: ...Installing Windows Server 2008 D 25 4 Activate Windows The Windows activation is complete...
Page 456: ......
Page 482: ...G 2 Using a Client Computer which has a CD Drive This page is intentionally left blank...
Page 486: ...H 4 Product Configuration Record Table This page is intentionally left blank...
Page 489: ......
Page 490: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 46FB 00...