
Installing Windows Server 2008 D-19
6.
Select a team type ([Adapter Fault Tolerance]/[Adaptive Load Balancing]).
Click [Next].
7.
Click [Finish].
8.
Click [TEAM: "Team name"] from [Device manager]
→
[Network adapters] to modify the team. Click [Settings] tab
and click [Modify Team] button.
9.
Refer to the following procedure to set the team member adapter priority status.
–
Set Primary
Point the adapter and click [Set Primary] button.
–
Set Secondary
Point the adapter and click [Set Secondary] button.
NOTE:
Adapter priority config can be confirmed by the following procedure:
1. Click [TEAM: "Team name"] from [Device manager]
→
[Network adapters].
2. Click [Settings] and confirm Adapters in team list.
10.
Click [Test Switch]
→
[Run test] to confirm the adapter team is properly setup.
Confirm the result in [Test results].
Even if the system is normal, the following mismatch message will appear sometimes. Recheck the switching hub
(L2) port and if there is no problem with the setting, ignore the messages.
–
The switch is configured with aggregatedd ports, but theteam type does not support port aggregation. The switch
is configured with VLAN tagging, but the team has no VLANs.
–
Change the team type to SLA, reconfigure the switch for link aggregation, or disable VLAN tagging on the
switch.
11.
Reboot the system.
Remove Team
1.
Open the [Device Manager].
2.
Click [Network adapters], and open [TEAM: "Team name"] properties.
3.
Click [Setting] tab.
4.
Click [Remove Team] button.
5.
Click [Yes] to the message.
6.
Confirm [TEAM: "Team name"] adapter in not existing in [Network adapters] tree and reboot the system.
Summary of Contents for NovaScale R460 E2
Page 1: ...NovaScale R460 E2 User s Guide NOVASCALE REFERENCE 86 A1 47FB 00...
Page 2: ......
Page 8: ......
Page 21: ...Notes on Using Your Server 1 3 Internal View...
Page 34: ...1 16 Notes on Using Your Server This page is intentionally left blank...
Page 392: ...9 96 Upgrading Your Server This page is intentionally left blank...
Page 402: ......
Page 404: ...C 2 IRQ This page is intentionally left blank...
Page 429: ...Installing Windows Server 2008 D 25 4 Activate Windows The Windows activation is complete...
Page 456: ......
Page 482: ...G 2 Using a Client Computer which has a CD Drive This page is intentionally left blank...
Page 486: ...H 4 Product Configuration Record Table This page is intentionally left blank...
Page 489: ......
Page 490: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 46FB 00...