19 Operation on an ISDN Access
264
ARGUS 152
End All Currently Running Tests or Connections
ARGUS - Main Menu.
Open the Test Manager
<TM>
or
Opens the Test Manager directly in
the Single Tests Menu if a
connection has already been setup
or if the ARGUS is running a test.
Test Manager
All tests will be terminated and
all connections cleared down.