![Argus 152 Manual Download Page 262](http://html1.mh-extra.com/html/argus/152/152_manual_2969444262.webp)
19 Operation on an ISDN Access
262
ARGUS 152
If a test (or connection) is canceled (or cleared), the ARGUS will return to the Test Manager
if there is another test (or connection) running in the background.
Some tests use so many resources that they cannot be run in every combination
with other tests. In this case, the ARGUS will display the message “Test not
possible at this time”.
Test / Connection
Number of times that a test or connection
can be started at the same time:
It is possible to
change to
another test:
Incoming call
2
Yes
Outgoing call
2
Yes
BERT
2
Yes
Loop
2
Yes
Service check
1
No
Suppl.serv.test
1
No
Time measurement
1
No
X.31 test
1
No
CF Interrogation /
Active / Delete
1
No
Automatic test
1
No
Tests 1/02 B01
An example of the display
The connection
was the first
started
There are 2
connections/
tests
The connection
uses B channel 1