
6-24
129373-496
Operating Instructions
Sterilizer Operation
NOTE: If sterilizer is equipped with double doors, the interlock type for Leak Test
cycle is factory set and fixed at Type #1. Refer to S
ECTION
8 for description of
interlock types.
2. Press
CYCLE SELECT
on screen #1.
Pressing OPTIONS advances display to
the first Out-of-cycle Options menu
(screen #13).
3. Press
TEST CYCLES
button.
Pressing MAIN MENU returns display to
screen #1.
4. To begin Leak Test, press
LEAK TEST
.
3
CYCLE SELECT
LEAK
TEST
DART
DART
TEST
WARMUP
Pressing STANDARD CYCLES returns
display to screen #2.
Pressing MAIN MENU returns display to
screen #1.
MAIN
MENU
STANDARD
CYCLES
OPTIONS
1
S T E R I S S C I E N T I F I C
STERILIZER PREPARED FOR:
STERIS SCIENTIFIC
CUSTOMER
** Not For Patient Use **
MAIN MENU
CYCLE
SELECT
OPEN
DOOR
CLOSE
DOOR
1.
PREVAC
4.
PREVAC
2.
GRAVITY
5.
GRAVITY
3.
LIQUID
6.
LIQUID
2
CYCLE SELECT
MAIN
MENU
TEST
CYCLES