
92
Troubleshooting and Maintenance Manual
4
General Maintenance
Reinstallation
Materials needed
•
Calibration valve (G3170-60204)
•
O-ring for calibration valve (0905-1217)
•
PFTBA (05971-60571)
•
Screwdriver, Torx T-15 (8710-1622)
1
Remove the old valve assembly. See
“To remove/reinstall the calibration
2
Be sure the valve O-ring is in place. If it is worn or damaged, replace it.
3
Install the calibration and vent valve assembly and tighten the screws that
hold it in place.
4
Reconnect the calibration valve cable to the connector.
5
Remove the vial from the new calibration valve. See
on page 89. The valve is supplied with a vial already
installed.
6
Fill and reinstall the calibration vial. See
7
Pump down the MS. See the
Agilent 7000 Series Triple Quad GC/MS
C A U T I O N
Do not turn on any GC heated zones until the carrier gas flow is on. Heating a column
with no carrier gas flow will damage the column.
Summary of Contents for 7000 Triple Quadrupole GC/MS
Page 24: ...24 Troubleshooting and Maintenance Manual 1 Introduction...
Page 50: ...50 Troubleshooting and Maintenance Manual 2 General Troubleshooting...
Page 122: ...122 Troubleshooting and Maintenance Manual 4 General Maintenance...
Page 144: ...144 Troubleshooting and Maintenance Manual 6 Vacuum System...
Page 182: ...182 Troubleshooting and Maintenance Manual 8 Electronics...
Page 213: ......
Page 214: ...Agilent Technologies Agilent Technologies Inc Printed in USA September 2009...