
76
Troubleshooting and Maintenance Manual
4
General Maintenance
Before Starting
For your safety, read all of the information in this introduction before
performing any maintenance tasks.
Scheduled maintenance
Common maintenance tasks are listed in
. Performing these tasks
when scheduled can reduce operating problems, prolong system life, and
reduce overall operating costs.
Keep a record of system performance (tune reports) and maintenance
operations performed. This makes it easier to identify variations from normal
operation and to take corrective action.
Table 6
Maintenance schedule
Task
Every week
Every 6 months
Every year
As needed
Tune the MS
X
Check the foreline pump oil level
X
Check the calibration vial
X
Replace the foreline pump oil
*
X
Check the foreline pump
X
Clean the ion source
X
Check the carrier gas trap(s) on the GC and MS
X
Replace the worn out parts
X
Lubricate side plate or vent valve O-rings
†
X
Replace CI Reagent gas supply
X
Replace GC gas supplies
X
*
Every 3 months for CI MSs using ammonia reagent gas.
†
Vacuum seals other than the side plate O-ring and vent valve O-ring do not need to be lubricated.
Lubricating other seals can interfere with their correct function.
Summary of Contents for 7000 Triple Quadrupole GC/MS
Page 24: ...24 Troubleshooting and Maintenance Manual 1 Introduction...
Page 50: ...50 Troubleshooting and Maintenance Manual 2 General Troubleshooting...
Page 122: ...122 Troubleshooting and Maintenance Manual 4 General Maintenance...
Page 144: ...144 Troubleshooting and Maintenance Manual 6 Vacuum System...
Page 182: ...182 Troubleshooting and Maintenance Manual 8 Electronics...
Page 213: ......
Page 214: ...Agilent Technologies Agilent Technologies Inc Printed in USA September 2009...