
68
Troubleshooting and Maintenance Manual
3
CI Troubleshooting
Large peak at
m/z
19
If the abundance of the peak at
m/z
19 is more than half abundance of the
peak at
m/z
17, then there is probably too much water in the system.
The system was not baked out sufficiently after it was last vented.
Bake out the system as described in
Moisture left over in the reagent gas supply tubing and flow module
Purge the reagent gas supply lines for at least 60 minutes.
Contaminated reagent gas supply
Replace the reagent gas supply and purge the lines and flow module.
Saturated methane/isobutane gas purifier
Replace the gas purifier.
Summary of Contents for 7000 Triple Quadrupole GC/MS
Page 24: ...24 Troubleshooting and Maintenance Manual 1 Introduction...
Page 50: ...50 Troubleshooting and Maintenance Manual 2 General Troubleshooting...
Page 122: ...122 Troubleshooting and Maintenance Manual 4 General Maintenance...
Page 144: ...144 Troubleshooting and Maintenance Manual 6 Vacuum System...
Page 182: ...182 Troubleshooting and Maintenance Manual 8 Electronics...
Page 213: ......
Page 214: ...Agilent Technologies Agilent Technologies Inc Printed in USA September 2009...