![Agilent Technologies 7000 Triple Quadrupole GC/MS Maintenance Manual Download Page 181](http://html1.mh-extra.com/html/agilent-technologies/7000-triple-quadrupole-gc-ms/7000-triple-quadrupole-gc-ms_maintenance-manual_2867624181.webp)
Electronics
8
Troubleshooting and Maintenance Manual
181
signal. On receipt of the ready signal, the desorbtion cycle begins. When a
specific temperature is reached, the purge-and-trap closes a contact to
indicate the run has started.
The ready pin on the remote start connector on the GC is held low at all times
except when the GC, MS, and data system are all ready. On system ready, a
logic high of 5 VDC is present between that pin and any ground. This same
high can be detected between the ready and ground pins on the remote start
connector on the MS.
Start run input
The best way to generate a start run signal is to use the remote start connector
on the GC. Since remote start cables are made for most common devices, this
is often the simplest way. A general-purpose remote start cable (05890-61080),
is also available that terminates in spade lugs. Care must be taken to ensure
that the system is actually ready before the start run signal is sent.
If necessary, the remote start connector on the back of the MS can be used to
send the start run signal. A contact closure between the start and ground pins
will start the run if the system is ready.
Summary of Contents for 7000 Triple Quadrupole GC/MS
Page 24: ...24 Troubleshooting and Maintenance Manual 1 Introduction...
Page 50: ...50 Troubleshooting and Maintenance Manual 2 General Troubleshooting...
Page 122: ...122 Troubleshooting and Maintenance Manual 4 General Maintenance...
Page 144: ...144 Troubleshooting and Maintenance Manual 6 Vacuum System...
Page 182: ...182 Troubleshooting and Maintenance Manual 8 Electronics...
Page 213: ......
Page 214: ...Agilent Technologies Agilent Technologies Inc Printed in USA September 2009...