Note
Action
Screw: M3x8 12.9 Gleitmo
603+Geomet 500 (2 pcs)
Refit the connector plate.
4
Tightening torque: 0.8 Nm
xx1800002489
Refitting the swing covers
Note
Action
Apply grease to the cable package, cover all
moving area of the package.
1
Apply grease to the covers that have contacting
area with the cable package.
2
Screw: M3x8 12.9 Gleitmo
603+Geomet 500
Refit the covers.
•
Swing cover
•
Swing support cover
3
Tightening torque: 1.2 Nm
xx1800003607
Concluding procedure
Note
Action
Calibration is detailed in section
Recalibrate the robot.
1
DANGER
Make sure all safety requirements are met when
performing the first test run.
2
Product manual - IRB 1100
517
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.8.2 Replacing the axis-2 gearbox
Continued
Summary of Contents for IRB 1100
Page 1: ...ROBOTICS Product manual IRB 1100 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 588: ...This page is intentionally left blank ...
Page 610: ...This page is intentionally left blank ...
Page 614: ......
Page 615: ......