Note
Action
Screw: M5x16 12.9 Steel Black
Oxide (6 pcs)
Refit the swing support.
Tip
If the swing support is hard to closely fit to the
lower arm, use a plastic hammer to knock on the
swing support lightly.
2
Tightening torque: 6 Nm
xx1800003079
Securing the upper cable package to the axis-2 gearbox
Note
Action
Screw: M2.5x6 12.9 Gleitmo
603+Geomet 500 (2 pcs)
Refit the cable bracket.
1
Tightening torque: 0.6 Nm
xx1800003002
Refitting the axis-2 motor
Note
Action
Check that:
•
all assembly surfaces are clean and without
damages
•
the motor is clean and undamaged.
1
Continues on next page
512
Product manual - IRB 1100
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.8.2 Replacing the axis-2 gearbox
Continued
Summary of Contents for IRB 1100
Page 1: ...ROBOTICS Product manual IRB 1100 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 588: ...This page is intentionally left blank ...
Page 610: ...This page is intentionally left blank ...
Page 614: ......
Page 615: ......